front view my hearseThis is the hearse restoration project I have imported from the USA. It arrived in early November 2010. The limousine style hearse was the most popular style of hearse in that time. It doesn't look particularly like a traditional hearse as we would know in the U.K. It is more or less half buick and half coach built .All the mechanics are buick as well as some of the distinguishing aesthetics. I now know it left the Flxible factory as a hearse/ambulance combination. The model number B23 is what denotes this as a combination car. It explains the heater in the rear! The hearse is going to be restored here over the next three years or so. It appears to have not been used for 30-40 years at least!
  my first glimpse of the hearse
The plan is to do it up over three years and to use it as a hearse and wedding car for hire ! It's big! 21 feet or 6.3 metres long, 6' 3.5''/1.9m tall, max width 6'4''. It has a 5.2 litre,150 horse power straight eight engine, automatic gearbox " Dynaflow" (2 speed!)  The interior on this one was leather front seat leather lining and door trim and a vinyl headlining. The rear was trimmed extensively with mohair with  leather lower door trim and a velvet headlining all in burgundy!last leg of the journey
 
Built by the Flxible company in Loudonville, Ohio, the Flxible professional cars ( hearses and ambulances) had a very distinct look from the mid thirties up to 1948.  Thereafter styling changed for much lower cars, during the period mentioned they raised the profile of the front end by welding in a seam to make the hood ( bonnet ) taller to keep the overall look of the car with its large coach built body aesthetically pleasing and in proportion, the rise was 5 and 5/8 inches! Flxible built the body and rear doors, stretched and strengthened the Buick chassis, uprated the rear suspension and used and adapted Buick Wheel arches, fenders, front doors and several Buick fittings in their design.
 
 Generally, Flxible used Buick cars but in some years they also used Cadillac and other luxury cars for,hearse,ambulance and  combination conversions. 1948 was their most prolific year for professional cars, all Buick Roadmaster based, some with manual transmission, with a total of 646 in 1948.
Funeral directors very often provided the ambulances and hearses over many decades in the U.S. and would run  ambulances, funeral hearses and combination cars in various combinations depending on the size of their business or the town they were in. This combination was finished in black  and looked just the same as a hearse from the outside, a carpet was used on this model to cover the coffin rollers when used as an ambulance, also there were sometimes cross emblems hung in the rear windows when serving as an ambulance.
This car would have cost more than $5k when new, back in 1948!
Thanks to Tom McPherson I now know the original owner of this vehicle was the Frank Funeral Home of Wellington, Kansas and it left the factory on November 7, 1948.  It also once belonged to a rock band. Neil Young owned a 1948 Flxible Buick hearse or combination but I don't think it was this one as I believe his was fitted with a manual gearbox. Many believe his song ' Long may you run' was written about his first hearse, the 48 which he called 'Mort' abbreviation for 'Mortimer Hearseburg',certainly not his Pontiac based 53 which was his second hearse. After the unknown rock band the next known owner was a guy in Kansas who never got around to doing the restoration. Possibly with him the car sat for decades without attention, as it surely has somewhere. Ok Oldies bought it from Kansas to Oklahoma and advertised it in Hemmings Auto News where a friend of mine saw it and told me about it and thats how it turned out to be here !
August 2011 . After the initial work on arrival back in November to assess the condition of the vehicle and particularly the engine and gearbox. The Hearse is now back in the workshop. In November we failed to get the engine out. The picture below shows the vehicle over the pit in the workshop. It shows the rear bumper tilted upwards. This is due to a clumsy attempt at moving the vehicle with a forklift truck maybe when moving to OK Oldies in Oklahoma where I bought it from. Or sometime before that. The damage underneath looked recent. The fuel tank had been crushed. It really is lots of hassle getting something this big that doesn't run, moved around, and it's best to find someone who specialises in moving extra large non runners to avoid the cowboys who claim to be able to move such things on a budget. It took 5weeks and 5 attempts to get this moved going the budget route, and I wouldn't recommend the guy who eventually did it. He was careful and it wasn't damaged but there was a considerable extra charge for loading on top of shipping not put in the 'quote'. 
 
hearse august 2011 005
 
Side view, not much roof clearance in the workshop !
hearse august 2011 side view in workshop showing height
The engine was partially stripped down in November 2010. The pistons were seized in the bores through standing. Some were freed up with Coca Cola, others with wd40 and others with a propane torch heating the cast iron block.  They were really stuck ! In the photo below many of the pistons have been removed and all have had the conrod caps removed.
hearse august 2011 straight eight engine 320ci or 5.2 litre in situ
The engine bay with engine removed.
hearse august 2011 engine removed
The engine with the head off and the dynaflow attached weighs around 1200 lbs or 540kg
hearse august 2011 engine and dynaflow removed together weighing over 500kg
 We lifted it  with  high tensile bolts screwed in the head mounting bolt holes two front most and two rear most. In the photo the two attached at the  front. We lifted the engine/trans over the front engine mount posts but these are removable so I guess you could hoist the motor and remove the posts to make extraction even easier ! Anyway, our simple method worked real well !
320 straight eight engine and transmission removal detail
The latest is the hearse is now almost just a body shell on wheels. The most major difficulty to date was drilling off all the door mountings from the pillars as these were held with crosshead screws which were seriously rusted. Thanks to a good quality set of drill bits, tough enough for stainless steel, all the doors were off in two hours.This would have taken all day with cheap drill bits ! The rear side windows are out as is the windshield, revealing some serious corrosion inside, just above the windshield. A pattern will have to be made and this section renewed. Wings, inner and outer are removed. The Bench seat, removed from the cabin. In the rear the wheel arch covers have been removed along with the rear door.
September 18, 2011
The hearse went to Henham Steam Rally for the day, although many of the major parts have been stripped off, what remained in one piece made a very popular attraction at the Rally. I hope to be in a position to take it there again next year but this will depend on the point of restoration at the time.
 
 December 12 2011
I have managed to get hold of some hard to get Buick parts, Rear bumper guards and the two cross-bars were missing. I have also got a lower cross-bar for the front bumper guards as mine was badly damaged. I also got reproduction badges from Bobs Automobilia for the bumper guard upper cross-bars. Also on the way are a pair of fender skirts ( rear wheel covers) also missing from my vehicle they are in restorable condition and again from US ebay. I am now attempting restoration of the hood ornament- the famous Buick bomb-sight as as I managed to get hold of a very poor one for next to nothing, again mine was missing, it looks like someone had tried to tow the vehicle with it the way it had been broken off.
 
February 2012
 A shipment of parts came from the States including a new fuel tank and many engine components.
 
April 29 2012. The schedule for the next two years.
I had the opportunity to concrete the barn floor so this happened at the back end of March. The agenda is the chassis will be cleaned and painted, brakes and steering components sorted/replaced, body work, straightened out for September. Wiring/electrics, starting and yard driving Winter 2012. the main paint prep in the following Spring for painting in Summer 2013. Glass fitting before upholstery Autumn 2013. 
 
May 30 2012
Engine work at the precision engineers completed and engine now back home awaiting reassembly . Meanwhile the dynaflow with torque convertor and cooler left yesterday for complete restoration.
 
August 25 2012.
The latest is that there are many jobs in progress at the moment. Although there is nothing yet completed good progress is being made: A hold up on the engine is because I decided to renew some of the valve lifters. I hadn't cleaned them and when I did some were not in A1 condition so they are coming with a consignment of; master cylinder, wheel cylinders X4, brake shoes, body mountings other bits and pieces. 
 
The front lever shocks have been sent to the States for rebuilding, Other suspension parts are being cleaned and powder coated in gloss black including springs and wheel backing plates, lower suspension arms.
 
The restructuring of the rotten sun visor mounting has been completed. This was the most major reconstruction required on this vehicle. Other reconstruction  now being done on the skins over the front door posts. Posts are solid, but have to be cut and rewelded to facilitate captive nut renewal for the door mountings.
 
October 14 2012 
The gearbox is still away but expected anytime now, guess it could still be a few weeks, my fault for stating that I wasn't in a hurry!
Engine work going on; Some time ago had valve seat work done, inlets were recut, exhaust seats were carefully cut for fitting of inserts, castings very thin so great care required! Checked seating of valves and grinding those needing perfecting, of these the recut inlets needed the least work. The inserts for the exhaust valves may have distorted a little on fitting or for another reason need grinding in. Am looking for as much contact as possible rather than the minimum I can get away with so some elbow grease required on some, but not all of them!
Engine is cleaned and painted in original Buick turquoise of  the period. Should really be back together very soon!
 
Rear  fenders, these are two door fenders, and were missing many of the flimsy mounting tags, mountings renewed or repaired as required and metal work straightened to original curves.
 
Front lever shocks returned from rebuild in U.S.
 
I bought a plasma cut exhaust manifold from Hells Gate Hot Rods in steel so my brother Kevin can make up a homemade stainless exhaust system with headers instead of the original cast iron manifold with its heat valve etc. This would have cost me around $1600 for the manifold parts going the original route. Too much money considering the modern alternative!
 
The latest agenda is to sort out the mess at the bottom of the front door posts, several pieces of sheet metal need attention. Under body clean seal and paint working front to back. This has given me a lot to do as most jobs and parts of the car are at the front. Sorting bodywork may take priority over running the engine and gearbox so I will  be going with the flow. Will probably paint fire wall and put in engine/gearbox radiator and run it before Spring. The rest of the engine bay is inner wings which are off and can be dealt with separately.
 
NOVEMBER 4, 2012
Rebuilt gearbox is back home. Engine work not going so smoothly at the moment.
 
MARCH 24, 2013
Had a problem with certain engine components, that is the conrods on the crankshaft. The issue seems to be related to distorted conrod bolts needing to be in the exact same way as the when the conrod bearing machining was done. I was frustrated during the rebuild process to find that new conrod bolts were not available. From my mechanical background these would have been changed as a matter of course on an engine rebuild of this scale as the old bolts would distort over time. Ideally the machining would have been done with new bolts fitted. I got fed up and left the project over the Winter, getting other jobs done around the place. During the time of abstinance though, I have bought another load of parts.
Shortly working most of the time on the hearse, hence my business open only two days a week this Summer. Managed to buy a new old stock Hood ornament,the famous Buick Bomb sight. Also Monday 18 March took radiator to  Express radiators,Norwich, for rebuild and they have already done it! Collecting Tuesday.
 
October 13.2013
The latest is rear door frame work has begun. The rear door frame is wood, carries the well built, heavy, rear door. This, to me, was seen as the hardest part of the restoration. Requiring total reconstruction, although some parts could be reffited. Other woodwork also being done now is bulkhead repair. The bulkhead had been badly hacked to open up the front and rear I think by the band when they had it. The new top part of the bulkhead will carry a solid, and not a sliding, window as originally fitted. Also a rear seat modelled on the front seat is being worked on. It will be just over 1.2m or 4 feet wide and provide spacious seating for two,when the car is fitted out for a wedding etc.
Under floor cleaning, the removal of undershield, is well underway in prerparation a new coating. Welding/reconstruction of bottom of front doors sheet metal is in danger of completion this week!

Powered by Create